• 0

Project Consultancy, Reports & Profiles

·         Reasons why you should Start a Business in Botswana

Botswana has become an attractive destination to start businesses, but very few people have done it. If you're still on the fence about starting your own business in Botswana, here are reasons why you should do it today:

Tourism Industry. One of the industries through which you can kick-start your business in Botswana is forming your travel and tourism business.

Business and Financial Service Industry.

Manufacturing Industry.

Energy Industry.

Health Industry.

Agriculture Industry

Mining Industry

Automotive Industry

 

·         There are Plenty of Opportunities for Growth

You may not have heard of Botswana, but there's a reason it was selected as one of The 10 Hottest Countries for Investment in 2016. The country is projected to experience GDP growth of 6% over the next five years, outpacing many of its neighbors and global competitors. In addition to political stability and steady economic growth, there is also plenty of potential for new businesses. Botswana is still very much a developing economy; nearly half of all workers are employed in agriculture or mining—two industries that are ripe for disruption. If you're looking for opportunities with big upside potential, Botswana might be just what you need.

 

·         What are the Natural Resources in Botswana?

Botswana is rich in natural resources. The country has huge deposits of diamonds, copper, nickel, coal, and gold. However, recent exploration indicates that there are also great reserves of zinc, lithium, tantalum, and substantial amounts of niobium and uranium. In addition to its abundant mineral resources, Botswana has large forests (about 7% of total land area), ample supplies of water, and fertile soils that could be used for crop production or grazing.

 

·         Is Botswana Good for Business?

Botswana's government has also made it easier for investors to do business, thereby lowering tax rates and loosening restrictions on foreign ownership. What makes Botswana such an attractive place to start a business? The economy is growing at an annual rate of 6%, making it one of Africa's fastest-growing economies. It is one of Africa's most stable countries, politically and economically, with relatively low crime levels (for Africa). In addition, its currency is stable due to its link with South Africa's rand at a fixed exchange rate. Botswana is one of Africa's leading economies and performs well regarding ease of doing business, trade, and access to infrastructure. With an estimated growth rate for 2016 of 5.4%, it is also ranked as one of Africa's most promising emerging markets. A large part of Botswana's success can be attributed to its sound fiscal management practices. According to Transparency International, Botswana ranks among the top 10 least corrupt countries in Africa, and several organizations have praised it for its anti-corruption efforts. In addition, it was recently recognized by The World Bank as having made significant progress in improving its business climate. This positive outlook makes Botswana a good place to start or expand your business.

 

·         Business-Friendly Policies and Government Initiatives

Thanks to relatively new laws and tax policies, setting up shop in Botswana has never been easier. One of Africa's fastest-growing economies and largest diamond producers, the country is poised for further growth. Companies with ties to neighboring African countries are now eligible for preferential import duties under BDFIA—which could save those hundreds of thousands of dollars on a single shipment!

 

·         What are the steps for Starting a Business in Botswana?

When starting a business, some basic procedures must be adhered to ensure that everything is completed according to protocol. The following information outlines what is needed from individuals who wish to register or set up businesses within Botswana. These steps include registering with the Companies and Intellectual Property Registration Office (CIPRO), registering for a VAT number, obtaining a local registration number, and registering with Revenue Services.

 

·         Industrial Growth Botswana

The economy of Botswana has been one of light but sustained growth over more than three decades, averaging about 4% annually since independence. Various factors have contributed to these favorable outcomes, including political stability, prudent economic policies, and favorable external circumstances. Industrial production grew by 5% per year from 1994 to 1999. Industry accounted for 17% of GDP in 1998. Mining is Botswana's leading industry, accounting for 60% of exports in 1997. The industry also employs about 15% of the labor force. In addition to diamonds, industrial minerals mined include coal, salt, soda ash (from which sodium carbonate is extracted), and nickel. There are also deposits of copper and iron ore.

 

·         Market Size Botswana

According to Trading Economics, Botswana's Gross Domestic Product per capita is $9,800; its export-to-GDP ratio is 43 percent, and its growth rate is 2.7 percent. The country's main exports are diamonds, copper ore, nickel ore, and gold. The World Bank ranks Botswana first in Africa for ease of doing business. The United States has bilateral investment treaties with 14 African countries, including Botswana and South Africa (the largest economy on the continent). These agreements provide for the protection of American investments by host governments and give U.S.-based investors.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Invest in This Peanut Butter Manufacturing Business and start reaping the Benefits today!
Invest in This Peanut Butter Manufacturing Business and start reaping the Benefits today!

 

Peanut butter is a spre... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Pre Feasibility Report for Manufacturing Glass Vials for a Range of Medicines Cosmetic and Other Injectable
Pre Feasibility Report for Manufacturing Glass Vials for a Range of Medicines Cosmetic and Other Injectable

INTRODUCTION... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Wheat Processing Unit (Wheat Starch, Vital Wheat Gluten,  Modified Starches, Fibres & Proteins)
Setup Wheat Processing Unit (Wheat Starch, Vital Wheat Gluten, Modified Starches, Fibres & Proteins)

 

A wheat processin... Read More

Capacity :
-
Plant and Machinery cost:
7200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
10300.00Lakhs
Add To Inquiry Basket
Ethyl Acetate Production Business
Ethyl Acetate Production Business

Ethyl acetate (sometimes sp... Read More

Capacity :
7200 MT Per Annum
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1700.00Lakhs
Add To Inquiry Basket
Set up NPK Complex Organic Fertilizer Plant
Set up NPK Complex Organic Fertilizer Plant

Fertilizers are soil additi... Read More

Capacity :
12 MT Per Day
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
417.00Lakhs
Add To Inquiry Basket
Pre-Feasibility Report for Production Linear Alkyl Benzene Sulphonic Acid
Pre-Feasibility Report for Production Linear Alkyl Benzene Sulphonic Acid

Because of its low cost, go... Read More

Capacity :
60 MT Per Day
Plant and Machinery cost:
550.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
5190.00Lakhs
Add To Inquiry Basket
Industrial Production of Ascorbic Acid Powder from Sorbitol Startup Business Opportunities for Entrepreneurs
Industrial Production of Ascorbic Acid Powder from Sorbitol Startup Business Opportunities for Entrepreneurs

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Bamboo Charcoal
Manufacturing Business of Bamboo Charcoal

 

Bamboo charcoal:

Read More

Capacity :
4 MT per day
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Production of Steel Shots and Grits Lucrative Business Opportunities in Steel Abrasives
Production of Steel Shots and Grits Lucrative Business Opportunities in Steel Abrasives

 

Steel Shots and Grits: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ethyl Acetate Manufacturing Detailed Project Report for setting up New Business
Ethyl Acetate Manufacturing Detailed Project Report for setting up New Business

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas
A Business Plan for FREEZE DRIED FRUIT and VEGETABLES Dry Banana Mango Custard Apple Beetroot Sapota Dragon Fruit Jamun and Green Peas

In the sublimation process of freeze-drying, sometimes referr... Read More

Capacity :
0
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)
Set Up Milk Processing Automatic Plant (Milk and Milk Powder)

A dairy product made from cow milk is powdered milk. Essentially, cow's milk is composed of water, lipids, protein, su... Read More

Capacity :
Pasteurised Milk 10,000 Units per Day Skimmed Milk Powder 10,000 Units per Day Raw Cream by Product
Plant and Machinery cost:
4900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
6300.00Lakhs
Add To Inquiry Basket
Setting Up Medical College  With Hospital
Setting Up Medical College With Hospital

A hospital is an institution that provides preventive, curative/ameliorative, palliative, or rehabilitative services i... Read More

Capacity :
100 Students, 500 bedded Hospital
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
12300.00Lakhs
Add To Inquiry Basket
Start Ferrosilicon Production Business
Start Ferrosilicon Production Business

Basically, ferrosilicon is a silica and iron alloy that comprises somewhere between 15% and 90% silicon. A "heat-blocker" c... Read More

Capacity :
26.7 MT per day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
3900.00Lakhs
Add To Inquiry Basket
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)
Start Profitable Industry of Lithium Ion Battery (Battery Assembly)

 

Lithium batteries ... Read More

Capacity :
48 Volt, 60 AH Lithium-Ion Battery Pack: 5.0 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack:
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.95%
Break Even Point (BEP):
70.65 %
TCI :
0.00 Lakhs
Cost of Project :
293.00Lakhs
Add To Inquiry Basket
Start Assembling of Lithium Ion Battery (Battery Assembly)
Start Assembling of Lithium Ion Battery (Battery Assembly)

 

A lithium-ion bat... Read More

Capacity :
48 Volt, 60 AH Lithium-Ion Battery Pack 10 Nos per day 48 Volt, 80 AH Lithium-Ion Battery Pack 10 No
Plant and Machinery cost:
165.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
538.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Micronutrients Fertilizer Manufacturing
Investment Opportunities in Micronutrients Fertilizer Manufacturing

 

Micronutrient effi... Read More

Capacity :
Micronutrient Fertilizer for Fruits: 1,250 Kgs/Day Micronutrient Fertilizer for Vegetables: 750 Kgs/
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
345.00Lakhs
Add To Inquiry Basket
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)

 

Limelight used oxygen extracted from the barium oxide Brin process, for example. This method in... Read More

Capacity :
3200 cumtrs/Day
Plant and Machinery cost:
183.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
675.00Lakhs
Add To Inquiry Basket
Manufacturing of Ply Board from Poplar & Eucalyptus Wooden Logs
Manufacturing of Ply Board from Poplar & Eucalyptus Wooden Logs

 

Ply Board is a typ... Read More

Capacity :
Poplar Ply Board Size: 8' x 4' Thickness: 18mm:250.0 Nos. Per Day Eucalyptus Ply Board Size: 8' x 4'
Plant and Machinery cost:
260.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
536.00Lakhs
Add To Inquiry Basket
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Solar Panel
Manufacturing Business of Solar Panel

 

A photovoltaic mo... Read More

Capacity :
33 KW per day
Plant and Machinery cost:
181.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
668.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity :
Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1656.00Lakhs
Add To Inquiry Basket
A Business Plan for Highway Guard Crash Barrier with Metal Beam  (Roll Forming) And Galvanizing Plant
A Business Plan for Highway Guard Crash Barrier with Metal Beam (Roll Forming) And Galvanizing Plant

Metal beam crash barriers, also known as guardrails, are an important safety feature on highways, bridges... Read More

Capacity :
Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day
Plant and Machinery cost:
701.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2608.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash By Solvay Process (without using limestone)
A Business Plan for Soda Ash By Solvay Process (without using limestone)

 

Soda ash, also known as sodium carbonate, is an essential chemical used in various industrial a... Read More

Capacity :
Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum
Plant and Machinery cost:
132500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
146900.00Lakhs
Add To Inquiry Basket
Engineered Building Steel Structure Manufacturing Business
Engineered Building Steel Structure Manufacturing Business

Pre-Engineered Building (PEB) Steel Structures are a type of building system used for... Read More

Capacity :
PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day
Plant and Machinery cost:
462.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Start Lithium Oxide From Lithium Ore Manufacturing Plant
Start Lithium Oxide From Lithium Ore Manufacturing Plant

Lithium oxide, also known as lithia, is a chemical compound c... Read More

Capacity :
Lithium Oxide 4 MT Per Day
Plant and Machinery cost:
578.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2808.00Lakhs
Add To Inquiry Basket
Start Maize Starch & Liquid Glucose Production Plant
Start Maize Starch & Liquid Glucose Production Plant

 

Maize starch is a white powder that is derived from the endosperm of the ma... Read More

Capacity :
-
Plant and Machinery cost:
3000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
Start Production Of Nickel From Nickel Ore
Start Production Of Nickel From Nickel Ore

Nickel is an essential elem... Read More

Capacity :
Nickel Cathod 4 MT Per Day
Plant and Machinery cost:
638.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
3030.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk

In place of conventional pa... Read More

Capacity :
Biodegradable Boxes wt. 30 gms 15,160,000 Nos Per Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
280.00Lakhs
Add To Inquiry Basket
A Business Plan for Epoxy Resin
A Business Plan for Epoxy Resin

Epoxy resin is a form of thermosetting polymer that is widely utilized in many indust... Read More

Capacity :
Epoxy Resin Liquid 100 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
A Business Plan For Polyurethane Prepolymer
A Business Plan For Polyurethane Prepolymer

The versatile substance known as polyurethane prepolymer, or PUP, is utilized in a va... Read More

Capacity :
Polyurethane Prepolymer (HMDI Series) 50,000 MT Per Annum
Plant and Machinery cost:
2336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
4866.00Lakhs
Add To Inquiry Basket
Start Industry of Activated Carbon from Coconut Shell
Start Industry of Activated Carbon from Coconut Shell

An organic form of activate... Read More

Capacity :
Activated Carbon 5 MT per day
Plant and Machinery cost:
316.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
743.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Medical Disposables Gowns and Drapes
Start Manufacturing of Medical Disposables Gowns and Drapes

 

Surgical gowns ar... Read More

Capacity :
Medical Gowns 1,250 Pcs Per Day Medical Drapes 1,250 Pcs Per Day
Plant and Machinery cost:
286.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
611.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business
Active Pharma Ingredients Metformin and Ciprofloxacin Manufacturing Business

Metformin (also known as Gl... Read More

Capacity :
Metformin 2,000 Kgs. Per Day Ciprofloxacin 1,000 Kgs. Per Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
584.00Lakhs
Add To Inquiry Basket
Business Plan for Calcium Sennoside from Senna Leaves Production
Business Plan for Calcium Sennoside from Senna Leaves Production

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Find out you can Start Manufacturing Camphor Powder (Technical Grade)
Find out you can Start Manufacturing Camphor Powder (Technical Grade)

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Peanut Butter Manufacturing Business Plan
Peanut Butter Manufacturing Business Plan

Peanut butter is a food paste or spread produced from ground dry roasted peanuts, als... Read More

Capacity :
10 Ton per day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1038.00Lakhs
Add To Inquiry Basket
Start Production of Silica from Rice Husk Ash
Start Production of Silica from Rice Husk Ash

In the concrete business, rice husk ash silica is a viable al... Read More

Capacity :
Silica 5.80 MT Per Day Activated Carbon (by product) 0.64 MT Per Day Sodium Carbonate (by product) 0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1121.00Lakhs
Add To Inquiry Basket
Profitable Business of Lithium Ion Battery Pack
Profitable Business of Lithium Ion Battery Pack

In a lithium ion (li-ion) b... Read More

Capacity :
Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
5000.00Lakhs
Add To Inquiry Basket
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin
How to Start Production of Active Pharma Ingredients Metformin and Ciprofloxacin

An active pharmaceutical in... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Project Report on Decortication and Packing of Peanut
Project Report on Decortication and Packing of Peanut

If you work in the food sector, especially if you deal with peanuts, you've probably h... Read More

Capacity :
Peanuts (50 Kgs each Bag): 400 Bags Per Day
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
534.00Lakhs
Add To Inquiry Basket
IV Cannula and Catheters Manufacturing Plant
IV Cannula and Catheters Manufacturing Plant

 

Although the name... Read More

Capacity :
IV Cannula with Wings & with Injection Port: 75,000 Pcs. per day Catheters: 18,750 Pcs. per day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Surgical Sutures Assembling
Manufacturing Business of Surgical Sutures Assembling

Surgical sutures are used t... Read More

Capacity :
250 Boxes per day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
313.00Lakhs
Add To Inquiry Basket
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups
Processing and Manufacturing of Cocoa Cocoa Butter, Cocoa Couverture and Cocoa Powder Processing Business Further Processed Products Spreads and Chocolate Syrups

To extract cocoa from raw, roaste... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs

 

Lithium ion (Li-ion) ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for PVC Edge Banding Tape Manufacturing Business
Business Plan for PVC Edge Banding Tape Manufacturing Business

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to setup Plastic Waste Recycling Plant
How to setup Plastic Waste Recycling Plant

A Plastic Waste Recycling Plant (also known as a Pla... Read More

Capacity :
-
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
401.00Lakhs
Add To Inquiry Basket
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit

Vehicle recycling is the de... Read More

Capacity :
-
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Badminton Rackets Manufacturing Business
Badminton Rackets Manufacturing Business

Badminton rackets productio... Read More

Capacity :
1000 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
353.00Lakhs
Add To Inquiry Basket
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap
Production of Stainless Steel Cold Rolled Coil using Stainless Steel Scrap

Cold rolling is a work hard... Read More

Capacity :
-
Plant and Machinery cost:
2400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
8300.00Lakhs
Add To Inquiry Basket
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan

Children's clothing may not... Read More

Capacity :
T-Shirts: 84 Pcs. per day | Bottom Wear: 84 Pcs. per day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business

 

Start Traction Motors Permanent Magnet Synchronous Motors, Br... Read More

Capacity :
Permanent Magnet Synchronious Motors (5 KW, 48/72 Volt with 3000 RPM) 40 Nos. Per Day Brushless
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
510.00Lakhs
Add To Inquiry Basket
Dental Care Products GI Cement & Composite Lite Cure Business Plan
Dental Care Products GI Cement & Composite Lite Cure Business Plan

Consider starting a glass i... Read More

Capacity :
GI Cement (Part A Powder 5 gms each & Part B Liquid 5 ml each) 20000 Pcs. per Day | Compsite Lite Cu
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
340.00Lakhs
Add To Inquiry Basket
Citric Acid Production Business Plan
Citric Acid Production Business Plan

Citrus fruits have a sour t... Read More

Capacity :
100 MT Per Day
Plant and Machinery cost:
8400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
13200.00Lakhs
Add To Inquiry Basket
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business
Lucrative Badminton Racket Manufacturing Business Manufacturing of Badminton Racket Business

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Epoxy Hardener Plant
Set Up Epoxy Hardener Plant

In order to create an epoxy resin for its intended use, epoxy hardeners are nearly always required. Epoxies do not com... Read More

Capacity :
Polyamide Hardener: 6 MT per Day Cycloaliphatic Amine Hardener:1.2 MT per Day
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
ZINC INGOTS Manufacturing Business Plan
ZINC INGOTS Manufacturing Business Plan

 

Zn, zinc is a chemical element. At normal temperature, zinc is a slightly brittle metal that, when its oxida... Read More

Capacity :
6 MT per Day
Plant and Machinery cost:
4500000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
52500000.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity :
100 CBM per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3100.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
12345678910...

Showing 481 - 540 of 597 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR